Pausing a Flow with Delay Next Step

in Flows
1 From the Flow Designer, navigate to Toolbox > FLOW MANAGEMENT.
2 Attach a Delay Next Step to the Outcome path of the step before that will be delayed.
3 Navigate to the Properties of the Delay Next Step; under [SETTINGS] > NumberOfSeconds, provide a numerical value for the desired number of Seconds that the Flow will wait on before resuming.
4 Save the Flow, then select the Debug link.
5 Ensure that the Delay Next Step waits the defined amount of time before continuing and completing the Flow as expected.
from: https://documentation.decisions.com/preview/v9/en/754e1953-f84c-4602-b562-8eef093af1b4/1
Howdy, Stranger!
Categories
- 4.4K All Categories
- 81 General
- 13 Training
- 209 Installation / Setup
- 1.2K Flows
- 110 Rules
- 270 Administration
- 213 Portal
- 497 General Q & A
- 711 Forms
- 346 Reports
- 3 Designer Extensions
- 48 Example Flows
- 58 CSS Examples
- 1 Diagram Tile
- 7 Javascript Controls
- 187 Pages
- 5 Process Mining
- New Features
- 186 Datastructures
- 70 Repository
- 230 Integrations
- 29 Multi-Tenant
- 27 SDK
- 81 Modules
- 59 Settings
- 26 Active Directory
- 12 Version 7
- 35 Version 8
- 143 Lunch And Learn Questions