Pausing a Flow with Delay Next Step

in Flows
1 From the Flow Designer, navigate to Toolbox > FLOW MANAGEMENT.
2 Attach a Delay Next Step to the Outcome path of the step before that will be delayed.
3 Navigate to the Properties of the Delay Next Step; under [SETTINGS] > NumberOfSeconds, provide a numerical value for the desired number of Seconds that the Flow will wait on before resuming.
4 Save the Flow, then select the Debug link.
5 Ensure that the Delay Next Step waits the defined amount of time before continuing and completing the Flow as expected.
from: https://documentation.decisions.com/preview/v9/en/754e1953-f84c-4602-b562-8eef093af1b4/1
Howdy, Stranger!
Categories
- 4.3K All Categories
- 70 General
- 11 Training
- 206 Installation / Setup
- 1.1K Flows
- 109 Rules
- 267 Administration
- 212 Portal
- 496 General Q & A
- 706 Forms
- 338 Reports
- 3 Designer Extensions
- 48 Example Flows
- 56 CSS Examples
- 1 Diagram Tile
- 7 Javascript Controls
- 184 Pages
- 5 Process Mining
- New Features
- 182 Datastructures
- 69 Repository
- 228 Integrations
- 28 Multi-Tenant
- 27 SDK
- 81 Modules
- 57 Settings
- 25 Active Directory
- 12 Version 7
- 35 Version 8
- 130 Lunch And Learn Questions