Lunch and Learn 6/12/2024

3:43 I would like help understanding the v9 import process from dev, qa and prod and some of the difference between them.

11:53 I have a flow that loops thru 1k records to run test case premium. When the debugger gets to the end of the data in the csv it should download a copy, but it stops on the last record and looks like it times out. Debugger still says its running but I have a clock symbol beside the flow in red.

16:53 When utilizing a file as an email attachment the name is always the name of the step the file came from: HTML Merge

For the full video: https://www.youtube.com/watch?v=XLcBAFABPQs

Sign In or Register to comment.