Reuse Assignment?
Comments
-
Hello Decisions,
I was wondering what does the “Reuse Assignment” option in the assignment setup settings used for?
[img]https://lh3.googleusercontent.com/H4vndR1VHTSCn_iDqe39lvcEQy2Cs87SLl4ntKsitFYwSDtmz-v89tV1Akdq3VzDV1v0Of9XZEzMHePJhRRZG8VJbkTM6TPUOBRo_3L8sZdch4aSEjjzuaoFnkPMxtCUBMvFKVau[/img] -
Hello,
The Reuse Assignment setting is a way for you to use less assignments while navigating back into the assignment. Use case: If you have a save button on the assignment that leaves the form, saves some data, and goes back into itself with Reuse assignment checked it maintains the same assignment data (Assignment Id, Start Date, etc.) for that assignment keeping everything about it the same. Making your system save and create less data. It is mostly used for routing back functionality. If you exit the flow the form is in, or the flow hits another form before going back however, then the Reuse Assignment setting would not work.
Howdy, Stranger!
Categories
- 2.1K All Categories
- 18 General
- 155 Installation / Setup
- 991 Flows
- 86 Rules
- 203 Administration
- 204 Portal
- 433 General Q & A
- 600 Forms
- 282 Reports
- 3 Designer Extensions
- 38 Example Flows
- 32 CSS Examples
- 1 Diagram Tile
- 5 Javascript Controls
- 139 Pages
- 1 Process Mining
- New Features
- 150 Datastructures
- 50 Repository
- 169 Integrations
- 25 Multi-Tenant
- 21 SDK
- 40 Modules
- 38 Settings
- 20 Active Directory
- 12 Version 7
- 34 Version 8