How do I schedule a flow to run 3 times per day?
Comments
-
How can I do this?
-
This can be accomplished using scheduled jobs.
Start by navigating to [b]System > Jobs And Events > Scheduled Jobs[/b] and clicking the [b]Add Schedule Job[/b] button.
For a full walk through, please see our documentation on [url=https://documentation.decisions.com/running-a-flow-on-a-schedule/]Running a Flow On a Schedule[/url]
-
To run a flow specifically 3 times in a day youll need to create three scheduled jobs at "Specified Time" and have them each call the same flow.
Howdy, Stranger!
Categories
- 4.2K All Categories
- 67 General
- 11 Training
- 202 Installation / Setup
- 1.1K Flows
- 106 Rules
- 262 Administration
- 212 Portal
- 490 General Q & A
- 695 Forms
- 333 Reports
- 3 Designer Extensions
- 47 Example Flows
- 52 CSS Examples
- 1 Diagram Tile
- 7 Javascript Controls
- 179 Pages
- 5 Process Mining
- New Features
- 179 Datastructures
- 69 Repository
- 221 Integrations
- 28 Multi-Tenant
- 27 SDK
- 78 Modules
- 56 Settings
- 25 Active Directory
- 12 Version 7
- 35 Version 8
- 83 Lunch And Learn Questions